REQUIREMENTS UK Read this guide carefully to achieve a good end result. The installations and methods shown are examples for guidance only. The building methods and materials you use must be suitable and approved for the purpose. The actual drain and pipework should be installed by a qualified plumber. It is advisable to have the shower screen fitted by a glazier – See suggestions for possible installation methods: A-A3 IMPORTANT: • Check that the seal between the outlet unit and the drain is positioned correctly before cementing in (see Figure 3). • The full width of the outlet unit and the drain unit must be properly supported (see Figure 10). • It is particularly important to degrease all steel surfaces before applying adhesive and membranes (see Figure 15). • Waterproofing membranes should overlap the end of the drain unit by at least 40 mm (see Figure 17) For more detailed instructions, refer to external suppliers’ instructions (e.g. wet room sealing, concrete casting, gluing etc.). For more information on approvals and certification, refer to www.unidrain.com FORUDSÆTNINGER DK Sæt dig godt ind i denne vejledning for at opnå et godt slutresultat. De viste konstruktioner er eksempler på vejledende byggemetoder. Byggemetoder og anvendte materialer skal være egnede og godkendte til formålet. Montage af selve afløbsarmaturet og rørinstallationen skal udføres af en autoriseret VVS montør. Det anbefales, at brusevæg monteres af en glarmester - Se forslag på mulige installationsmetoder: A-A3 VIGTIGT: • Tjek om pakningen mellem udløbshus og afløbsarmatur sidder korrekt inden nedstøbning. (se illustration 3) • Udløbshuset og afløbsarmaturet i sin fulde bredde skal understøttes grundigt (se illustration 10) • Det er særlig vigtigt at affedte alle stålflader inden påføring af lime og membraner (se illustration 15) • Vådrumsmembraner skal overlappe afløbsrenden enden med minimum 40 mm (se illustration 17) For detaljeret udførelse henvises i øvrigt til eksterne leverandørers anvisninger (f.eks. vådrumssikring, betonstøbning, limning osv.). For mere information om godkendelser og certificering henvises til www.unidrain.dk S E FÖRUTSÄTTNINGAR UNIDRAIN uppfyller kraven i Boverkets Byggregler (BBR). UNIDRAIN uppfyller Byggkeramikrådets branschregler för våtrum (BBV) och är anpassad till Branschregler för Säker Vatteninstallation. I Sverige gäller särskilda systemgodkännande krav för väggnära golvbrunnar i kombination med specifika tätskiktsfabrikat. För godkända kombinationer och monteringsanvisningar för respektive tätskiktsfabrikat se www. bkr.se, www.sakervatten.se, www.gvk.se eller www.unidrain.se De visade konstruktionerna är exempel på vägledande byggnadsmetoder. De byggmetoder och material som används ska vara avsedda och godkända för ändamålet. • Kontrollera att packningen mellan utloppshus och avloppsarmatur sitter korrekt monterad innan ingjutningen påbörjas (bild 3). • Följ vald tätskiktsleverantörs monteringsinstruktioner (bild 13-20). • Plattsättning skall utföras enligt tillverkarens monteringsinstruktioner (bild 21-23). • Följ glasväggsleverantörens monteringsinstruktioner och beakta hur glasväggen skall placeras innan golv- och väggplattor monteras. För mer information om godkännanden och certifiering, se www.unidrain.se 2/16 V01
Download PDF file