Easy Installation & Assembly Tips Before Installing Overall Process For Installing Any Décor+ by Elfa Space • Always start by mounting your Top Track. • If lighting is part of your solution, run Lighting Cables through your Hanging Standards using the Cable Organizers and pull connector ends through the correct slots (bend ends back so they don’t fall back through the slots) according your Space Plan. Allow Lighting Cable to hang out 3"-4" / 75mm-100mm from the bottom of the Standard. • To square up the solution, first hang Standards on the Top Track. Push Standards together and add all Brackets. Position Standards according to your Space Plan. Add top Shelves to keep Standards in place. Use a level to square up Standards. Use a pencil to mark holes for securing Standards to wall. Remove Shelves used to square up your solution. Slide Standards over so you can drill pilot and anchor holes. Insert anchors. Slide Standards back into place. Do not screw the Standards to the wall at this time. • Connect Lighting: Secure Transformer in Cable Box. Mount Cable Box to Standards close to your power source. Add necessary Lighting Cables to link Lighting Cables in Standards together, pulling Lighting Cables up and across Top Track as needed. After installing Back Panels (if any) and Wire Shelves, install Light Bars and connect to Lighting Cables. Connect Lighting Cable and bottom of Standard to Transformer. Plug Power Cord into outlet. Install cable covers. • If Back Panels are part of your solution, secure an outside Standard to the wall (if there is a Standard next to an obstruction, secure THAT Standard). Install Back Panels, securing the next Standard as you go. • Install Shelves working from the top down. • Build all Drawer Boxes. Install Drawers working from the bottom up. • Add Mesh Drawers as you go. • If no Back Panels, secure Standards to wall. • Add any accessories and install covers for Top Tracks and Standards. 2 ©2025 The Container Store Inc. All rights reserved. WF548781 02/25
Download PDF file